Four recent bathrooms, matched to the kind of houses we see most in Winchester. Real dimensions, real timelines, real spend ranges once the actual jobs are in.

project1.pngproject1.1.png

Project one

The Center Village Victorian

The house: A Victorian home near the town center, original cast iron tub-shower combo behind plaster walls.

The problem: The drain line had corroded and the plaster around the tub showed water staining from years of a slow leak behind the surround.

What we did: Removed the tub, updated the drain and supply lines while the wall was open, and built a tiled walk-in shower with a low curb and a frameless glass panel.

Timeline: About 5 working days on site, roughly 4 to 5 weeks total from quote to finished walkthrough.

Rough spend: {PROJECT_1_COST}

PROJECT_2.pngPROJECT_2.2.png

Project two

The Postwar Cape Reset

The house: A 1960s Cape with the original fiberglass tub-shower unit still in place.

The problem: The seal behind the surround had failed years earlier, and mold and soft subfloor turned up once the old unit came out.

What we did: Replaced the damaged subfloor section, reframed for a slightly larger footprint, and installed a fully tiled walk-in shower with a built-in niche.

Timeline: About 6 working days on site given the subfloor repair, roughly 5 weeks total.

Rough spend: {PROJECT_2_COST}

PROJECT_3.pngPROJECT_3.2.png

Project three

The Curbless Conversion

The house: A 1950s colonial with a standard tub-shower combo in the only full bathroom in the house.

The problem: The homeowners wanted to stay in the house long-term and needed a shower they could step into without a curb to clear.

What we did: Reframed the floor to drop the shower area for a curbless entry, installed a tiled shower with a built-in bench and blocking for grab bars.

Timeline: About 6 to 7 working days on site given the floor framing work, roughly 5 to 6 weeks total.

Rough spend: {PROJECT_3_COST}

PROJECT_4_.pngPROJECT_4_1.png

Project four

The Rail Corridor Refresh

The house: A 2000s home along the commuter rail corridor with an already-tiled shower original to the build.

The problem: The subfloor had settled slightly, leaving the pan out of level and pooling water near one corner, and the frosted glass door had gone out of style.

What we did: Reset the pan, corrected the slope to the drain, and replaced the enclosure with clear frameless glass and updated fixtures.

Timeline: About 3 working days on site, roughly 3 to 4 weeks total.

Rough spend: {PROJECT_4_COST}

See more, or start yours

Ask about a project like yours and we’ll tell you honestly which of these your bathroom is closest to. Call 857-465-6711, see the full scope of the work on the service page, or reach us through the contact page.